BlogPitch care
Cricket groundsman jobs for October
By Dan4 min read
October is the month the new grass comes through. If you renovated in September, most of this month's cricket groundsman jobs are about looking after the seedlings, keeping people off and bringing the square down to its winter height. If you didn't get round to renovating, there's still a short window. This is the October list in our monthly series, following on from the September jobs.
The square: looking after the new grass
In good conditions new seed shows in 7 to 10 days. It slows down as the soil cools, so later sowings take longer.
- Keep people off. Leave the ropes and signs up until the grass is established and the loam has weathered in. One junior training session on a germinating square undoes a lot of work.
- Keep the seed moist. For the first couple of weeks, light and regular water helps if it doesn't rain.
- Look for gaps. Anywhere the seed hasn't taken, rake it lightly and sow again while there's still warmth in the ground.
First cut and winter height
Don't rush the first cut. Wait until most of the new grass has two leaves and stands around 25 to 40 mm. Then:
- use a sharp mower, on a dry surface
- take off no more than a third of the leaf in one go
- bring the height down gradually over the next few cuts
Aim to settle the square at a winter height of around 18 to 22 mm. Too long and the leaf stays wet and invites disease. Too short and the grass has nothing to work with through the winter.
Feeding the new grass
Once the new grass is up and has had a cut or two, an autumn feed helps it harden off for winter. Go for one low in nitrogen and higher in potassium, and follow the rate on the bag (around 35 g per square metre is typical).
- Put it down on a dry surface over moist soil.
- Avoid days with frost forecast, or wind.
- Keep iron off the new grass until it's established. Iron is for moss on older turf, and there's more on that in the moss guide.
Still to renovate?
If the square hasn't been done, the first half of October is usually the last sensible window, and only if it stays mild with no night frosts. The full method is in the renovation guide. If you're into late October, read putting a cricket square to bed first. It covers whether it's worth it, and what to do instead.
Dew, leaves and worm casts
- Brush the dew off. On damp, overcast and still mornings, brush or switch the square. Leaves that stay wet for hours are how autumn disease gets going.
- Clear the leaves. Get them off before they mat down and smother the grass.
- Worm casts. Brush them in when they're dry, before mowing, so they spread instead of smearing. No chemical worm control has been legal in the UK since 2017, so boxing off clippings and clearing leaves (both feed worms) is the way to keep numbers down.
Don't roll yet
Rolling comes back in the new year, once the square starts drying out ahead of the season. In autumn the soil is wet, so a roller smears the surface and squeezes out the air the roots need.
The outfield
- Raise the height. Around 20 to 25 mm if the outfield is cricket only, over 30 mm if it's shared with a winter sport.
- Slit or tine it. Once the ground has softened, slit or solid tine to 125 mm or more. Not when it's waterlogged, frozen or thawing.
- Keep the leaves off, the same as the square.
Kit away for the winter
- Flat sheet covers: clean and dry them, bag them, and store them off the ground somewhere frost-free.
- Mobile covers: take the tops and banners off and chain the frames together.
- Sightscreens: clean them, take the slats or mesh out, and park them somewhere sheltered.
- Nets: take them down, or at least lift them clear of the ground.
- The mower: if the cylinder regrind and service isn't booked yet, book it now. Dealers fill up through the winter and get busy from February.
Admin: the AGM, stock and funding
- The AGM report. Write down what the square did this season while it's fresh: which wickets played well, which struggled, what the renovation cost and what the square needs next year.
- Stock take. Loam, seed, fertiliser and line paint. Order spring stock early.
- Funding. Two ECB funds are open until 30 November 2026: the Grass Pitch Improvement Fund (which uses a PitchPower assessment of your square) and the Tackling Climate Change Fund (drainage, irrigation and electric mowers or rollers among other things). Check the details with your county cricket board and County Pitch Advisor before you apply.
- SALTEX. The grounds show is at the NEC on 11 and 12 November, and it's free. Worth a day out.
October at a glance
| Priority | Job | When |
|---|---|---|
| 1 | Keep people off the new grass, keep seed moist | all month |
| 2 | First cut at two leaves, then down to winter height | when the seedlings are ready |
| 3 | Autumn feed, low nitrogen, no iron on new grass | after the first cuts |
| 4 | Brush the dew, clear leaves, brush in dry worm casts | most mornings |
| 5 | Outfield: raise the cut, slit or tine | when not wet or frozen |
| 6 | Covers, sightscreens and nets away, mower booked in | early in the month |
| 7 | AGM report, stock take, funding bids | wet days |
November is about the one big winter job on the square, aeration, and keeping an eye out for disease in mild, damp weather. For the whole winter in one place, see putting a cricket square to bed.
Frequently asked questions
When should I first cut a cricket square after overseeding?
When most of the new grass has two leaves and is around 25 to 40 mm tall. Use a sharp mower on a dry surface and take off no more than a third of the leaf. A blunt blade pulls young seedlings out instead of cutting them.
Is October too late to renovate a cricket square?
The first half of October can still work if it stays mild with no night frosts. After that it gets risky, because the soil is cooling and young grass needs a few weeks to establish before the first frosts. If you've missed it, fill the worst holes and overseed thin areas in spring.
Should I roll the square in October?
No. Rolling waits until the new year, once the square starts drying out for the season. In autumn the soil is wet, so a roller smears the surface and squeezes out the air the roots need.
How do I get rid of worm casts on a cricket square?
Brush or drag them in when they're dry, before you mow, so they spread instead of smearing. Box off the clippings and clear leaves, because both feed worms. No chemicals are approved for worm control in the UK, so this is the only option.
Written by Dan, founder of My Ground App, built with the groundsmen at Roe Green CC in the Greater Manchester Premier League.